Choose another solution

COMMERCIAL & MULTIFAMILY

Your project. Every moving part.

FICTIONAL DEMO · NOTHING SAVED
Harbor Point ApartmentsJE

PROJECT WORKSPACE / 07

Site Walk · deficiency log

Harbor Point Apartments · Walk SW-015 · Interactive, fictional field observations

Demo

Interactive demo with fictional records. It runs only in your browser: nothing is saved, uploaded or sent, and Reset discards everything. Site Walk with voice notes, photos and AI note sorting is in GenStruc today; subcontractor assignment, due dates and review/close steps are demo only. Details below the log.

Open deficiency1SW-014-01 · firestopping
Ready for review1Superintendent closes
Photos uploaded0Yours stay in your browser

INTERACTIVE SITE WALK · RUNS IN YOUR BROWSER

Walk Harbor Point and log deficiencies

Demo · nothing saved

Choose a building, floor and unit, describe the deficiency by voice or text, add a photo, assign the subcontractor and follow it to closure. Everything is fictional and stays in this browser tab.

This walk needs JavaScript turned on in your browser. The observation log below shows the fictional sample records.

Observation log · Harbor Point Apartments

The trade starts and reports each correction; only the Superintendent can close it or send it back. Switch “Acting as” to try both sides.

  • SW-014-01Openhigh priority

    Firestop sealant missing around the drain line penetration.

    Building A · Level 2 · Unit 204 · Bathroom · pipe penetration

    Punch / deficiency · SealTight Firestop (Firestopping) · due Nov 4 · sample record

    1. Chris Vega · Superintendent (Meridian) Recorded on walk SW-014.

    Next: Start correction

  • SW-014-02Ready for reviewmedium priority

    Drywall damaged at the window return.

    Building A · Level 2 · Unit 206 · Living room · east wall

    Punch / deficiency · Coastal Interiors (Drywall) · due Nov 5 · sample record

    1. Chris Vega · Superintendent (Meridian) Recorded on walk SW-014.
    2. Coastal Interiors · Drywall Marked ready for review.

    Next: Review & close or Send back · follow-up needed

  • SW-013-04Closedlow priority

    Exit sign not lit.

    Building B · Level 1 · Corridor / common area · Corridor · stair 2 door

    Safety · Volt Point Electric (Electrical) · due Oct 30 · sample record

    1. Chris Vega · Superintendent (Meridian) Recorded on walk SW-013.
    2. Volt Point Electric · Electrical Marked ready for review.
    3. Chris Vega · Superintendent (Meridian) Reviewed on site and closed. Note: Sign lit on battery test.
In GenStruc today
  • Start Site Walk on a project with voice or typed notes, photos, GPS location and weather. Voice uses the browser’s dictation, as here.
  • AI sorts each walk note into type, building, level, unit, trade and priority, and can create a punch item. This page does not run that AI.
  • Finishing a walk drafts an AI walk report, including safety observations and a timed progress log.
Demo only on this page
  • Assigning a deficiency to a subcontractor, due dates and the Open → In progress → Ready for review → Closed steps. Punch items in GenStruc today are open or done.
  • The “Acting as” switch and its role checks.
  • Filling fields from your note. Here a simple keyword match runs in your browser; no AI runs on this page.
  • Photos are never uploaded here.

SELECTED CONTEXT

SW-014-01 · Missing firestop

Building A · Level 2 · Unit 204 · bathroom drain line penetration.

Assigned to: SealTight Firestop (fictional).

Walk notes feed the daily report: see the Nov 2 field notes.

Open daily reports
Screen 7 of 9 · Commercial journeyNext: Daily reports

YOUR NEXT STEP

A fit for your projects?

See featuresView pricingStart Free Trial