Two-week look-ahead

Harbor Point Apartments · Nov 2–13, 2026 · Fictional schedule

Demo
Look-ahead activities6Selected fictional period
Review flags2Human coordination required
Predecessor hold1Slab inspection

GUIDED SCENARIO · SCHEDULE INTELLIGENCE

Schedule delay and critical-path impact

3 actions

BEFORE · FICTIONAL RECORDS

Look-ahead looks normal

Exterior windows · east: Nov 5–10 with 2 days of float.

Submittal 08-001 (window shop drawings) is needed back Nov 3; the architect now forecasts Nov 8.

  • Exterior windows · east
  • East dry-in milestone
  • L2 drywall hang
  • 08-001

STEP 1 OF 3 · AI

Real GenStruc AI feature · sample output

Delay found: east windows

Impact

Submittal 08-001 is forecast 5 days late (Nov 3 → Nov 8), so the exterior windows · east finish moves from Nov 10 to Nov 15.

Its 2 days of float absorb part of the slip. The east dry-in milestone moves 3 days (Nov 12 → Nov 15), and L2 drywall hang, on the critical path, starts Nov 16 instead of Nov 13.

Evidence

08-001 forecast Nov 8 · Exterior windows · east float 2 d · L2 drywall hang float 0 d.

STEP 2 OF 3 · AI

Real GenStruc AI feature · sample output

Recovery options for the team

Option 1

Ask the architect for a partial return on the east-elevation units by Nov 4. One day late stays inside the 2 days of float, so the milestone holds.

Option 2

Start L2 drywall on the west side first, where the east windows do not hold the work.

Not changed

AI does not change dates or notify anyone.

STEP 3 OF 3 · PROJECT MANAGER

Your team’s decision · illustrative

Team chooses option 1

The scheduler updates dates only after the architect confirms.

Team chooses option 1
ActivityIf partial return arrives Nov 4Without action
Exterior windows · eastFinish Nov 11 (1 day of float used)Finish Nov 15
East dry-in milestoneNov 12 · holdsNov 15 · +3 days
L2 drywall hangStart Nov 13 · holdsStart Nov 16 · +3 days
Result

A 3-day critical-path slip is caught on Nov 2, with a recovery path chosen while there is still float to use.

Related:Submittal 08-001Two-week look-ahead

Scripted sample: prewritten from this demo’s fictional records. No AI runs on these pages, and nothing is saved or sent. Labels: Real GenStruc AI feature · sample output / Your team’s decision · illustrative.

GUIDED SCENARIO · AI LOOK-AHEAD PLANNER

Build a two-week look-ahead

1 action

BEFORE · FICTIONAL RECORDS

Schedule window: Nov 2–13

Six activities, two predecessor holds and one open submittal.

  • L2 slab inspection
  • L2 framing
  • MEP rough-in · L1
  • Exterior windows · east
  • 08-001

STEP 1 OF 1 · AI

Real GenStruc AI feature · sample output

Two-week look-ahead · Nov 2–13

Two-week look-ahead · Nov 2–13
StartActivityCrewReady?
Nov 2L2 slab inspectionField teamReady
Nov 3L2 framingCarpentryHold · needs slab inspection
Nov 4MEP rough-in · L1MEP tradesReady · 25% complete
Nov 5Exterior windows · eastEnvelopeHold · submittal 08-001
Nov 12East dry-in milestoneEnvelopeAt risk · follows windows
Nov 13L2 drywall hangDrywallAt risk · follows dry-in
Summary

2 ready · 2 on hold · 2 at risk. A superintendent confirms crews before it is shared.

Result

The superintendent gets a ready/hold list for the next two weeks in seconds, instead of rebuilding it by hand.

Related:Schedule risk

Scripted sample: prewritten from this demo’s fictional records. No AI runs on these pages, and nothing is saved or sent. Labels: Real GenStruc AI feature · sample output.

Schedule & look-ahead

Fictional records
Two-week look-ahead fictional data
ActivityStartFinishFloatProgressResponsible
L2 slab inspectionNov 2Nov 20 d · critical0% · ScheduledField team
L2 framingNov 3Nov 60 d · critical0% · Awaiting predecessorCarpentry
MEP rough-in · L1Nov 4Nov 136 d25% · In progressMEP trades
Exterior windows · eastNov 5Nov 102 d0% · At riskEnvelope
East dry-in milestoneNov 12Nov 120 d · milestoneNot reachedEnvelope
L2 drywall hangNov 13Nov 200 d · critical0% · Not startedDrywall

SELECTED CONTEXT

Exterior windows · east

Predecessor: opening verification.

Constraint: window shop drawing response (submittal 08-001).

Successors: east dry-in milestone, then L2 drywall hang.

Review related submittal