Harbor Point ApartmentsJE

PROJECT WORKSPACE / 03

Budget, GMP & buyout savings

Harbor Point Apartments · Fixed GMP contract · Every figure is fictional

Demo

All numbers are fictional. Scripted changes on this screen are demo simulations, not AI or live automation, and nothing is saved, approved or paid. In GenStruc today: Budget tabs for GMP, Buyout Tracker, Change Orders and Financial Reports; Current GMP = original GMP + approved owner change orders; subcontractor change requests never change the GMP; change-order approval limits per person. Not in GenStruc today: recording executed subcontract awards and tracking buyout savings realized, used and remaining. Those parts are labeled Demo only.

Original GMP · fixed$28.40MRevised GMP $28.40M · owner COs pending
Projected final cost$25.75MEstimate $26.00M · gross margin $2.65M
Buyout savings remaining$250K$500K realized − $250K used

GUIDED SCENARIO · FIXED-GMP SAVINGS TRACKING

Buyout savings: realized, used and remaining

6 actions

BEFORE · FICTIONAL RECORDS

At GMP signing · estimate only

Original GMP $28,400,000 · fixed. Initial estimated cost $26,000,000 (trade packages plus general conditions).

Projected gross margin $2,400,000 = GMP − estimated cost (fee and contingency). No trades are awarded, so there are no savings yet.

  • 03 · Concrete & sitework
  • 09 · Interiors & finishes
  • BIDS-09
  • SCO-LOG
  • COST-LOG
  • CO-004

STEP 1 OF 6 · PROJECT MANAGER · JORDAN ELLIS

Demo only · not available in GenStruc today

Buyout: $500,000 realized savings

Five signed awards came in below their budgets. Interiors is still out to bid: the $90,000 gap to the low bid is not counted, and that trade stays forecast at budget.

GenStruc does not record executed awards or track savings today; this step is shown for illustration only.

Bids received · 09 Interiors & finishes · budget $4,700,000 (fictional)

Arbor Interiors · $4,610,000 · bid, not awarded

Keystone Finishes · $4,735,000 · bid, not awarded

Buyout: $500,000 realized savings
FigureBeforeAfterChange
Realized buyout savings$0$500,000+$500,000
Savings remaining$0$500,000+$500,000
Projected final cost$26,000,000$25,500,000−$500,000
Projected gross margin$2,400,000$2,900,000+$500,000
Original GMP (fixed)$28,400,000$28,400,000No change

STEP 2 OF 6 · PROJECT MANAGER · JORDAN ELLIS

Demo simulation · scripted, fictional numbers · not AI

Subcontract cost change orders use $175,000

These are cost changes with subcontractors, not owner change orders. They raise projected cost and use savings; the GMP stays fixed.

Subcontract cost change orders · approved by Meridian (fictional)

SCO-01 · Bayline Concrete · Added rebar at L2 transfer slab (coordination gap) · $110,000

SCO-02 · Coastal MEP Partners · Relocated plumbing riser at existing utility (field condition) · $65,000

Subcontract cost change orders use $175,000
FigureBeforeAfterChange
Savings used$0$175,000+$175,000
Savings remaining$500,000$325,000−$175,000
Projected final cost$25,500,000$25,675,000+$175,000
Projected gross margin$2,900,000$2,725,000−$175,000
Original GMP (fixed)$28,400,000$28,400,000No change

STEP 3 OF 6 · PROJECT MANAGER · JORDAN ELLIS

Demo simulation · scripted, fictional numbers · not AI

Other overruns use $75,000 more

Savings used now total $250,000 ($175,000 subcontract COs + $75,000 other overruns), leaving $250,000.

Using savings is a tracking view your team controls. Nothing is transferred automatically, and savings are never moved into contingency.

Other cost overruns · recorded by Meridian (fictional)

OC-01 · Tower crane rental extended 3 weeks · General conditions · $45,000

OC-02 · Winter protection and temporary heat · Self-performed work · $30,000

Other overruns use $75,000 more
FigureBeforeAfterChange
Savings used$175,000$250,000+$75,000
Savings remaining$325,000$250,000−$75,000
Projected final cost$25,675,000$25,750,000+$75,000
Projected gross margin$2,725,000$2,650,000−$75,000
Original GMP (fixed)$28,400,000$28,400,000No change

STEP 4 OF 6 · PROJECT ENGINEER · PRIYA SHAH

GenStruc workflow · sample records · not AI

Someone tries to bill SCO-01 to the owner

Refused: subcontract cost changes never change the GMP. Only owner-approved change orders do.

STEP 5 OF 6 · PROJECT MANAGER · JORDAN ELLIS

Demo simulation · scripted, fictional numbers · not AI

Owner approves CO-004 · separate from savings

The owner pays for the added scope, so revised GMP and projected cost rise by the same amount. Original GMP, margin and savings do not move.

In GenStruc, approving an owner change order updates Current GMP once.

Change order CO-004 · pending owner approval (fictional)

Handrail embed plates at L2 stair core · Design revision · +$38,600 · 0 days (fabricated off the critical path).

Owner-requested scope after the structural engineer’s answer. Owner change orders are kept separate from subcontract cost changes.

Owner approves CO-004 · separate from savings
FigureBeforeAfterChange
Original GMP (fixed)$28,400,000$28,400,000No change
Revised GMP$28,400,000$28,438,600+$38,600
Projected final cost$25,750,000$25,788,600+$38,600
Projected gross margin$2,650,000$2,650,000No change
Realized buyout savings$500,000$500,000No change
Savings remaining$250,000$250,000No change

Allowed: within Jordan’s approval limit ($50,000 · sample), with the owner’s signed approval attached (sample).

STEP 6 OF 6 · DEMO SUMMARY

Demo simulation · scripted, fictional numbers · not AI

Totals reconcile · nothing counted twice

Margin is a projection, not realized profit, and is shown before any owner share of savings. Savings-sharing clauses or contingency terms in your contract may change how much is available.

Totals reconcile · nothing counted twice
CheckCalculationResult
Savings remaining$500,000 realized − $250,000 used$250,000
Projected final cost$26,000,000 estimate − $500,000 savings + $250,000 used + $38,600 owner scope$25,788,600
Same cost, built from records$19,275,000 awarded + $4,700,000 not awarded + $38,600 owner scope + $1,775,000 general conditions and other costs$25,788,600
Revised GMP$28,400,000 original (fixed) + $38,600 approved owner COs$28,438,600
Projected gross margin$28,438,600 − $25,788,600$2,650,000
Result

Buyout realized $500,000; subcontract COs and other overruns used $250,000; $250,000 remains. The original GMP stayed at $28,400,000 throughout. Every figure is fictional.

Related:Schedule & look-aheadRFI register

Scripted sample: prewritten from this demo’s fictional records. No AI runs on these pages, and nothing is saved or sent. Labels: Demo only · not available in GenStruc today / Demo simulation · scripted, fictional numbers · not AI / GenStruc workflow · sample records · not AI.

Budget & Financials

Fictional records
Budget, GMP & buyout savings fictional data
Trade packageBudgetAwardSubcontract COsStatusBuyout savings
03 · Concrete & sitework$4,900,000$4,780,000+$110,000Awarded · Bayline Concrete$120,000 realized
06 · Framing & carpentry$3,700,000$3,640,000—Awarded · Tidewater Framing$60,000 realized
07 · Roofing & waterproofing$1,500,000$1,420,000—Awarded · Summit Roofing$80,000 realized
08 · Windows & glazing$2,100,000$1,968,000—Awarded · Clearline Glazing$132,000 realized
09 · Interiors & finishes$4,700,000——Not awarded · forecast at budgetNot counted until awarded
22–26 · Mechanical, plumbing & electrical$7,400,000$7,292,000+$65,000Awarded · Coastal MEP Partners$108,000 realized

SELECTED CONTEXT

How buyout savings are counted here

Realized savings come only from signed awards below their trade budget. Trades not yet awarded stay at budget, and pending bids never count.

Subcontract cost change orders and other overruns use up savings first. They raise projected cost but never change the GMP.

Savings remaining are not profit. Savings-sharing clauses or contingency terms in your contract may change how much is available.

Walk through savings realized, used and remaining

Buyout savings · realized, used, remaining

Fictional buyout savings ledger
ItemTypeAmount
03 · Concrete & sitework · Bayline ConcreteRealized · signed award vs budget$120,000
06 · Framing & carpentry · Tidewater FramingRealized · signed award vs budget$60,000
07 · Roofing & waterproofing · Summit RoofingRealized · signed award vs budget$80,000
08 · Windows & glazing · Clearline GlazingRealized · signed award vs budget$132,000
22–26 · Mechanical, plumbing & electrical · Coastal MEP PartnersRealized · signed award vs budget$108,000
Realized buyout savingsSigned awards only$500,000
SCO-01 · Bayline Concrete · Added rebar at L2 transfer slab (coordination gap)Used · subcontract cost CO−$110,000
SCO-02 · Coastal MEP Partners · Relocated plumbing riser at existing utility (field condition)Used · subcontract cost CO−$65,000
OC-01 · Tower crane rental extended 3 weeksUsed · general conditions overrun−$45,000
OC-02 · Winter protection and temporary heatUsed · self-performed work overrun−$30,000
Savings usedSubcontract COs + other overruns−$250,000
Savings remainingUnallocated · not profit$250,000

Not counted as savings: 09 Interiors & finishes, still out to bid and forecast at its $4,700,000 budget. The $90,000 gap to the low bid counts only once a subcontract is signed. Savings-sharing clauses or contingency terms in your contract may change how much is available. Nothing is transferred automatically.

GMP · original stays fixed

Fictional GMP summary
ItemStatusAmount
Original GMP · signed contractFixed$28,400,000
Approved owner change ordersNone approved yet$0
Revised GMPOriginal + approved owner COs only$28,400,000

Not in the GMP: pending owner change orders ($224,600, exposure only), rejected ones ($212,000, no effect) and all subcontract cost change orders.

Change orders · kept in two separate logs

Owner change orders · change the GMP once approved

Fictional owner change orders
NumberDescriptionSourceValueScheduleStatusEffect
CO-001Upgraded lobby finishesOwner directive+$186,0000 daysPendingExposure only · not in GMP
CO-004Handrail embed plates at L2 stair coreDesign revision+$38,6000 daysPendingExposure only · not in GMP
PCO-005EV charging stations in garageOwner request+$212,000+3 daysRejectedNo effect

Subcontract cost change orders · change cost only, never the GMP

Fictional subcontract cost change orders
NumberSubcontractorDescriptionCostStatusEffect
SCO-01Bayline ConcreteAdded rebar at L2 transfer slab (coordination gap)+$110,000ApprovedUses buyout savings · GMP unchanged
SCO-02Coastal MEP PartnersRelocated plumbing riser at existing utility (field condition)+$65,000ApprovedUses buyout savings · GMP unchanged
Approve CO-004 in the guided scenario

Projected final cost & gross margin

Fictional cost and margin bridge
LineAmount
Initial estimated cost · trades $24,300,000 + general conditions $1,700,000$26,000,000
Less realized buyout savings−$500,000
Plus subcontract cost change orders+$175,000
Plus other overruns+$75,000
Plus approved owner change-order scope$0
Projected final cost$25,750,000
Check · awarded $19,275,000 + not awarded $4,700,000 + general conditions and other costs $1,775,000 + owner scope $0$25,750,000
Revised GMP$28,400,000
Projected gross margin · was $2,400,000 at signing$2,650,000

Each dollar is counted once: savings already lower the cost, and change orders and overruns raise it. Margin includes the fee ($1,500,000) and unused contingency ($900,000). It is a projection, not realized profit, shown before any owner share of savings. GenStruc’s live Financial Reports stay more conservative and do not count savings until signed-award records are available.