COMMERCIAL & MULTIFAMILY
Your project. Every moving part.
PROJECT WORKSPACE / 04
RFI register
Harbor Point Apartments · Project-scoped questions and responses
GUIDED SCENARIO · RFI DRAFTING + SUGGESTED ADDRESSEE
Draft an RFI from a flagged drawing issue
BEFORE · FICTIONAL RECORDS
A person flags an issue on the drawings
“A-201 shows a handrail post at the stair core, grid C/4. S-102 detail 4 shows no embed plate at that slab edge.”
- FL-07
- A-201
- S-102
- RFI-024
- DIR-01
STEP 1 OF 2 · AI
Real GenStruc AI feature · sample outputDraft RFI-025 · not sent
Subject
Handrail embed plate at L2 stair core slab edge
Question
A-201 (rev 03) shows a handrail post at grid C/4 on the Level 2 stair core. S-102 detail 4 (rev 02) shows no embed plate at that slab edge. Please confirm whether an embed plate is required and provide its size and anchorage.
References
A-201 · grid C/4 · S-102 · detail 4 · related: RFI-024
Suggested addressee
Keel Structural, structural engineer of record (owns S-102). Copy: Studio Arden Architects (owns A-201).
STEP 2 OF 2 · PROJECT MANAGER
GenStruc workflow · sample records · not AIRFI-025 logged by the project manager
The person who flagged it reviewed the draft before logging. In this demo nothing is saved or sent.
| RFI | Subject | Status | Ball in court |
|---|---|---|---|
| RFI-025 | Handrail embed plate at L2 stair core | Open · sample | Keel Structural |
Result
A clear, referenced RFI is ready minutes after the issue is spotted, addressed to the right firm.
Related:Plans: A-201 and S-102
Scripted sample: prewritten from this demo’s fictional records. No AI runs on these pages, and nothing is saved or sent. Labels: Real GenStruc AI feature · sample output / GenStruc workflow · sample records · not AI.
RFIs
Fictional records| RFI | Subject | Status | Due | Ball in court |
|---|---|---|---|---|
| RFI-024 | L2 slab edge at stair core | Open | Nov 3 | Design team |
| RFI-023 | Lobby ceiling coordination | Answered | Oct 30 | Project manager |
| RFI-022 | East elevation opening | Open | Nov 4 | Architect |
SELECTED CONTEXT
RFI-024 · Slab edge
Question: confirm the edge detail at the stair core where A-201 and S-102 meet.
Requested by: Jordan Ellis · Project manager (fictional).
Response: not received. No design decision is assumed.
View referenced drawingYOUR NEXT STEP