COMMERCIAL & MULTIFAMILY

Your project. Every moving part.

FICTIONAL DEMO · NOTHING SAVED
Harbor Point ApartmentsJE

PROJECT WORKSPACE / 04

RFI register

Harbor Point Apartments · Project-scoped questions and responses

Demo
Open RFIs7Fictional project
Due this week2For review
Selected question1RFI-024

GUIDED SCENARIO · RFI DRAFTING + SUGGESTED ADDRESSEE

Draft an RFI from a flagged drawing issue

2 actions

BEFORE · FICTIONAL RECORDS

A person flags an issue on the drawings

Flag FL-07 · placed on S-102 by Jordan Ellis, project manager (fictional)

“A-201 shows a handrail post at the stair core, grid C/4. S-102 detail 4 shows no embed plate at that slab edge.”

  • FL-07
  • A-201
  • S-102
  • RFI-024
  • DIR-01

STEP 1 OF 2 · AI

Real GenStruc AI feature · sample output

Draft RFI-025 · not sent

Subject

Handrail embed plate at L2 stair core slab edge

Question

A-201 (rev 03) shows a handrail post at grid C/4 on the Level 2 stair core. S-102 detail 4 (rev 02) shows no embed plate at that slab edge. Please confirm whether an embed plate is required and provide its size and anchorage.

References

A-201 · grid C/4 · S-102 · detail 4 · related: RFI-024

Suggested addressee

Keel Structural, structural engineer of record (owns S-102). Copy: Studio Arden Architects (owns A-201).

STEP 2 OF 2 · PROJECT MANAGER

GenStruc workflow · sample records · not AI

RFI-025 logged by the project manager

The person who flagged it reviewed the draft before logging. In this demo nothing is saved or sent.

RFI-025 logged by the project manager
RFISubjectStatusBall in court
RFI-025Handrail embed plate at L2 stair coreOpen · sampleKeel Structural
Result

A clear, referenced RFI is ready minutes after the issue is spotted, addressed to the right firm.

Related:Plans: A-201 and S-102

Scripted sample: prewritten from this demo’s fictional records. No AI runs on these pages, and nothing is saved or sent. Labels: Real GenStruc AI feature · sample output / GenStruc workflow · sample records · not AI.

RFIs

Fictional records
RFI register fictional data
RFISubjectStatusDueBall in court
RFI-024L2 slab edge at stair coreOpenNov 3Design team
RFI-023Lobby ceiling coordinationAnsweredOct 30Project manager
RFI-022East elevation openingOpenNov 4Architect

SELECTED CONTEXT

RFI-024 · Slab edge

Question: confirm the edge detail at the stair core where A-201 and S-102 meet.

Requested by: Jordan Ellis · Project manager (fictional).

Response: not received. No design decision is assumed.

View referenced drawing
Screen 4 of 9 · Commercial journeyNext: Submittals