Choose another solution

SINGLE-FAMILY HOMEBUILDING

Build one home. See the whole picture.

FICTIONAL DEMO · NOTHING SAVED
Cedar Grove / Lot 12 / AspenAM

HOME WORKSPACE / 04

Lot 12 · Site Walk

Cedar Grove · Walk SW-007 · Interactive, fictional field observations

Demo

Interactive demo with fictional records. It runs only in your browser: nothing is saved, uploaded or sent, and Reset discards everything. GENSTRUC Homebuilding Site Walk is in Preview and not yet released; see “In GenStruc today” and “Demo only” below the log.

Open observation1SW-006-01 · framing
Awaiting verification1Superintendent signs off
Photos uploaded0Yours stay in your browser

INTERACTIVE SITE WALK · RUNS IN YOUR BROWSER

Walk a home and log what you see

Demo · nothing saved

Choose a community and lot, describe the issue by voice or text, add a photo, assign the trade and follow it to verification. Everything is fictional and stays in this browser tab.

This walk needs JavaScript turned on in your browser. The observation log below shows the fictional sample records.

Observation log · Cedar Grove

The trade starts and reports each correction; only the Superintendent can verify it or send it back. Switch “Acting as” to try both sides.

  • SW-006-01Openhigh priority

    Missing backing for the upper cabinets.

    Cedar Grove · Lot 12 · 128 Willow Lane · Aspen · Kitchen · north wall

    Punch / deficiency · Pine Ridge Framing (Framing) · due Nov 4 · sample record

    1. Alex Morgan · Superintendent Recorded on walk SW-006. Related extra work request: EPO-014.

    Next: Start correction

  • SW-006-02Corrected · awaiting verificationmedium priority

    Seal the panel feed penetration before insulation.

    Cedar Grove · Lot 12 · 128 Willow Lane · Aspen · Garage · east wall

    Punch / deficiency · Brightline Electric (Electrical) · due Nov 5 · sample record

    1. Alex Morgan · Superintendent Recorded on walk SW-006.
    2. Brightline Electric · Electrical Reported the work corrected.

    Next: Verify & close or Send back · follow-up needed

  • SW-005-03Verifiedlow priority

    Door rubs the head jamb; adjust hinges.

    Cedar Grove · Lot 14 · 132 Willow Lane · Birch · Bedroom 2

    Punch / deficiency · Oak & Iron Trim (Trim / carpentry) · due Oct 30 · sample record

    1. Alex Morgan · Superintendent Recorded on walk SW-005.
    2. Oak & Iron Trim · Trim / carpentry Reported the work corrected.
    3. Alex Morgan · Superintendent Verified on site and closed. Note: Door swings freely.
In GenStruc today
  • Start Site Walk on a home, with voice or typed notes. Voice uses the browser’s dictation, as here.
  • Confirm the community and lot before a note is saved, so it cannot land on the wrong home.
  • Location, trade, type and priority on each observation, and a photo attached to it.
  • Status Open → In progress → Corrected → Verified, with a note when the Superintendent verifies.
  • GENSTRUC Homebuilding is in Preview and not yet released. Its optional AI wording suggestion is in development.
Demo only on this page
  • Due dates on observations.
  • The “Acting as” switch. In the product, each person signs in with their own access.
  • Filling fields from your note. Here a simple keyword match runs in your browser; no AI runs on this page.
  • Photos are never uploaded here.

SELECTED CONTEXT

Kitchen · Missing backing

Observation: confirm backing for upper cabinets.

Assigned to: Pine Ridge Framing (fictional).

Related extra work request: EPO-014.

View related EPO
Screen 4 of 8 · Homebuilding journeyNext: Inspections

YOUR NEXT STEP

A fit for your homes?

See featuresView pricingStart Free Trial